NMFS-CV-BO-IWW-17

In-water Pile Driving Application

The number of piles, type/size of the piles, estimated sound levels caused by the driving, how many piles will be driven each day, and any other relevant details on the nature of the pile driving activity must be included in the project application. See Section 1.3.3 Program Administration (https://suscon.org/wp-content/uploads/2018/09/2018-08-31-NOAA-Restoration-Centers-Central-Valley-BiOp.pdf) for further details on the project application process.