NMFS-CC-BO-SDM-02
Work Placement
All construction will take place out of the wetted channel either by implementing the project from the bank and out of the channel or by constructing cofferdams, relocating aquatic species found within the project reach, and dewatering the channel. No more than 250 linear feet (125 feet on each side of the channel) of riparian vegetation will be disturbed for project access. All disturbed areas will be re-vegetated with native grasses, trees, or shrubs appropriate for the site.