NMFS-CC-BO-WQHM-02

Erosion Control Methods

Effective erosion control measures shall be in place at all times during construction. Do not start construction until all temporary control devices (straw bales with sterile, weed free straw, silt fences, etc.) are in place downslope or downstream of project site within the riparian area. The devices shall be properly installed at all location where the likelihood of sediment input exists. These devices shall be in place during and after construction activities for the purposes of minimizing fine sediment and sediment/water slurry input to flowing water and of detaining sediment-laden water on site. If continued erosion is likely to occur after construction is completed, then appropriate erosion prevention measures shall be implemented and maintained until erosion has subsided. Erosion control devices such as coir rolls or erosion control blankets will not contain plastic netting of a mesh size that would entrain, fish, reptiles or amphibians.