NMFS-NC-BO-GPM-10
Erosion Control Post Construction
Immediately after project completion and before the close of the seasonal work window, all exposed soil shall be stabilized with erosion control measures such as mulch, seeding, and/or placement of erosion control blankets. Where straw, mulch, or slash is used on bare mineral soil, the minimum coverage shall be 95 percent with two-inch minimum depth.