NMFS-CC-BO-IWW-21
Instream Construction Location
Where feasible, the construction shall occur from the bank, or on a temporary pad underlain with filter fabric.
Where feasible, the construction shall occur from the bank, or on a temporary pad underlain with filter fabric.