NMFS-CC-BO-IWW-28

Prescence of Spill Containment Materials

Oil absorbent and spill containment materials shall be located on site when mechanical equipment is in operation with 100 feet of the proposed watercourse crossings. If a spill occurs, no additional work shall commence in-channel until (1) the mechanical equipment is inspected by the contractor, and the leak has been repaired, (2) the spill has been contained, and (3) NMFS and CDFW are contacted and have evaluated the impacts of the spill