NMFS-NC-BO-IWW-06

Removal of Diversion and Barriers to Flow

When construction is complete, the flow diversion structure shall be removed as soon as possible in a manner that will allow flow to resume with the least disturbance to the substrate. Cofferdams will be removed so surface elevations of water impounded above the cofferdam will be reduced at a rate that will minimize the probability of fish stranding as the area upstream becomes dewatered.