NMFS-CV-BO-IWW-11

Sediment Containment During In-Water Construction

Sediment-laden water shall be filtered or discharged from the construction area to an upland location or settling pond where it will not drain back into the stream channel. The settling pond may act as an infiltration basin so that water can be returned to the stream system while sediment is captured.