NMFS-CC-BO-WQHM-03
Sediment Controls Maintenance
Sediment shall be removed from sediment controls once it has reached one third of the exposed height of the control. Whenever straw bales are used, they shall be staked and dug into the ground to a minimum depth of 12 cm, and only sterile, weed-free straw shall be utilized.