USFWS-SPM-DS-01

Work Windows

In-water work occurring in waters potentially supporting Delta smelt will occur between August 1 and November 30.* Not to exceed the self-imposed take limit of no more than one individual injured or killed annually. The local USFWS Field Office and Project Proponent will work together during the ESA Section 7(a)(2) Review Form process to ensure an individual project does not adversely affect a significant portion of the population in the project area. The self-imposed take limit also requires no net loss of habitat through the protection measures and/or offsetting impacts with habitat restoration or enhancement.

Footnote:
* Extended or alternative work windows may be considered on an individual project basis with prior approval from USFWS ES, provided the Project Proponent can demonstrate that measures implemented to avoid or minimize exposure would do so at a level commensurate with the standard work windows.